Hydraulic Perimeter Xtrude System

Hydraulic Perimeter Xtrude System

  • Designed for: Installation of shear walls, columns, and core walls.
  • Safety and Efficiency: Acts as a robust safety barrier while streamlining construction processes across the full floor plate.
  • Boosts Productivity: Reduces time and resource use, improving project profitability and construction timeframes.
  • Custom Solutions: Tailored to fit your project’s specific goals and operational needs.
  • Collaborative Approach: We work closely with your team to ensure seamless integration and optimised performance.
  • Tailored Solutions: That elevate safety standards and propels projects towards timely and cost effective completion.

Contact us to learn how our Hydraulic Perimeter Xtrude System can enhance safety and efficiency in your next project.

Features & Benefits

  • Australian-Designed & Certified: Custom-engineered to fit your project’s unique needs.
  • Comprehensive Coverage: Full deck coverage for vertical columns, core walls, and shear walls.
  • Adaptability: Suited for various project shapes and sizes, with trailing screens that climb as part of the system.
  • Powerful Hydraulics: SF25 large rams for efficient system lifting.
  • Boom Pump & Alimak Access: Integration options available for enhanced functionality.
  • Enhanced Safety: Provides a robust safety system throughout the structure.
  • Operational Efficiency: Reduces time and resources required on-site.
  • Economic Savings: Labour and cranage savings with minimal crane use needed for installation and dismantling.
  • Custom Solutions: Tailored to fit specific project needs, including forming shear walls, columns, and cores in one system.
Australian-Engineered & Durable:
  • Robust safety and long-term value for diverse projects.

Safety Barrier:
  • Provides a strong safety perimeter, raising site safety standards.

Streamlined Efficiency:
  • Speeds up construction, saving time and resources.

Collaborative Solutions:
  • Tailored to your project needs for timely, cost-effective completion.

Our Projects

Testimonial

“Using Sureform’s SF14 System, we’ve achieved the overrun pour, base pour setup, complete system assembly, 6 pours and 4 jumps of the system within 40 working days… on a project that had no onsite storage capacity.”
Simon McMahon - Operations, Safety & QA Manager
Eltrax Constructions

Get The Quote