Crane Handled Systems – Precast Propping System

Crane Handled Systems

  • Designed for: Installing lift and stair core shaft walls in low to medium-level construction projects.
  • Precast Propping System: Climbs the precast core above the floor slab, eliminating the need for propping and scaffold systems.
  • Australian-Engineered: Streamlines workflows and reduces time on site with crane-handled applications.
  • Efficient and Safe: Increases productivity while maintaining top safety standards.
  • Tailored Solutions: Customised to fit your project needs for seamless integration.
  • Collaborative Approach: We work closely with your team to enhance safety, efficiency, and cost-effectiveness.

Contact us to learn how our systems can set new benchmarks for safety and productivity in your next project.

Features & Benefits

  • Australian-Engineered: Designed for seamless crane integration and durability.
  • Crane-Handled Wallforms: Fully crane-handled wallforms and core boxes.
  • Precast Propping System: Enables precast cores to climb above the floor slab, eliminating the need for propping and scaffold systems.
  • Intuitive Design: Easy alignment with project specifications for efficient construction

 

  • Increased Efficiency: Boosts operational efficiency and reduces on-site risks.
  • Enhanced Safety: Eliminates propping through the slab and scaffolding in core boxes, ensuring a safer work environment.
  • Economic Savings: Reduces time, labour, and overall costs.
  • Collaborative Solutions: Tailored systems designed to meet specific project needs for timely and cost-effective completion.

 

Australian-Engineered & Durable:
  • Ensures robust safety and long-term value.

Safety Barrier:
  • Delivers a strong perimeter, enhancing site safety.

Streamlined Efficiency:
  • Accelerates construction, saving time and resources.

Collaborative Solutions:
  • Customised for your project, ensuring timely and cost-effective delivery.

Our Projects

Testimonial

“Using Sureform’s SF14 System, we’ve achieved the overrun pour, base pour setup, complete system assembly, 6 pours and 4 jumps of the system within 40 working days… on a project that had no onsite storage capacity.”
Simon McMahon - Operations, Safety & QA Manager
Eltrax Constructions

Get The Quote