Project Description

Client: POLETTI CORPORATION

  • 2 floor pour jumpform system
    When using the SF25-2FP two floors are poured at once, this provides a saving in steel reinforcing, as the lapping of the reinforcement are reduced to every second floor. The SF25-2FP system was used to form the core walls of the 20 storey structure.