Project Description

Client: Drive Projects

Sureform Systems SF14 was supplied to form the core walls of the 25 storey structure.

  • Stripping cell
    The core for this project had a very tight shaft for stair access air stabilisation, so tight the it would have been unsafe to place personnel in that area to work, so Sureform designed a cell that could be set and stripped by adjusting threads from platform 1 of the system, eliminating the need for personnel to enter the narrow cell.
  • Perimeter Protection Screen
    Redesign of existing screens (70 Queens Rd)