Project Description

Client: Poletti Corporation

  • Jumpform system
    SF25 Sureform System used to form the core walls of the 61 storey structure.
  • Perimeter columnform system
    All the columns for this project were linked with structural steel and climbed of hydraulic rams as a part for the core system.
  • Perimeter protection screens
    All of the Perimeter Screens were suspended on the structural steel that supported the Columnforms, this enabled the all of the screens, the Columnforms and the core system to be jumped simultaneously in approximately 1 hour and 20 minutes. When this system is jumped it leaves behind a floor with completed façade.